INITIAL STARTUP PROCEDURES
1. Unpack gPRO®, check for any obvious damage.
2. Remove spare parts bag, check contents against spare parts list.
3. Connect green O2 LINE (supplied with gPRO2™ unit) (See “Figure A”) to a pressurized O2 source regulator (cylinder or O2 generator), with O2 source pressure set to 80-90 PSI.